Journal
What we did, not what we announced.
Notes from the stand, the chamber, and the bay. Written after the work, not before.

2026-08-12 · Mare
Night cycle 14: the chassis still answers.
Three hundred and fifty hours in the dust chamber. Filters clogged on schedule. Motors did not.

2026-06-04 · Vector
Pathfinder hotfire, stand 2.
A start that sounded like a start. Then we pulled the powerhead and looked.

2026-03-19 · Tether
First bus mate in high bay A.
Copper blankets on. Optical head aligned. The structure is no longer a drawing.

2025-11-02 · Mare
The chassis rolls.
Six mesh wheels, a Texas floor, and a list of things that already need changing.